Method Statement for Construction of Jetty
- Type:
- Other > Other
- Files:
- 4
- Size:
- 1.86 MB
- Tag(s):
- Method Statement for Construct method statement specification documentation
- Uploaded:
- Apr 24, 2017
- By:
- Anonymous
PLEASE SHARE !! ****************This document is for your reference only******************* Title : Method Statement for Construction of Jetty File Type : MS Word 2007 or up File Size : 1.2 MB Date: : 24.04.2017 Authors : Airgildjane By : Purpose and Scope This method statement describes the techniques and methods to be implemented and the resources to be utilized for construction of Temporary Jetty to facilitate loading/unloading of materials and equipment from/ on to vessels. The scope of works comprises the following separate operations: • Mobilization of main and auxiliary equipment and personnel • Construction of access causeway • Mobilization of the prefabricated temporary Jetty to site • Installation of the temporary jetty • Rock filling inside and around the temporary jetty • Decommissioning of temporary jetty